Reporting & PPWR
The Reporting & PPWR module answers two questions: are my numbers ready to submit? and am I on track for the EU Packaging and Packaging Waste Regulation (PPWR)? It does not ask you to re-enter anything - it reads the products, packaging, volumes and markets already in your workspace and turns them into a report you can act on.
What it produces
The module has two parts, one below the other.
| Part | What it gives you |
|---|---|
| Submission-ready EPR figures | A per-market table of tonnage placed on the market and the estimated fee, each row carrying its confidence status, plus a one-click PDF export. |
| PPWR readiness | A tile per PPWR pillar showing which are already covered by an Oblifee module and which are still upcoming. |
Submission-ready EPR figures
For each of your markets, the table shows:
- Tonnage placed on the market over the reporting window.
- The estimated fee, in the market's own currency.
- A confidence status on the figure - confirmed or illustrative - so you know how far to lean on it before filing.
A Download report button produces the branded Oblifee PDF - the same figures as a document you can attach to a scheme submission or share internally. The PDF is covered in detail under Report exports.
:::info Why "submission-ready", not "submitted" Oblifee prepares the figures and the report; it is not a filing portal. You take the export to each scheme. That boundary is deliberate - see What Oblifee is not. :::
PPWR readiness
The EU PPWR reshapes packaging obligations around a handful of pillars. The module shows a tile for each, so you can see where Oblifee already helps and what is on the roadmap:
| PPWR pillar | Status in Oblifee |
|---|---|
| Recyclability | Covered today by the Recyclability (RAM) module. |
| Recycled content | Upcoming. |
| Labelling | Covered today by On-pack labelling. |
| Reuse | Upcoming. |
| Substances of concern | Upcoming. |
Pillars that are live link straight through to the module that handles them; upcoming pillars are marked as such.
How it fits together
Availability
During the beta, every module is open to every workspace. As modules move to general availability, Reporting & PPWR becomes a switchable add-on - see Plans & modules.
Where to go next
- EU PPWR readiness - the pillars in detail and how readiness is shown.
- Report exports - the submission-ready PDF and CSV packs.
- Analytics & reports - the full PDF report and its contents.
- Confidence & citations - what the status labels mean.